Abu Dhabi · Commercial / Government · 2026
ADNEC Tower — 2nd Floor
In 2026 at Abu Dhabi, Beavcon delivered full fit-out: demolition, partitions, specialty ceilings, electrical & hvac, firefighting, automated glass, furniture & carpet for a developer client. Constraint: Occupied tower; consultant and authority approvals on the critical path. Outcome: Full floor handed over with close-out documentation.
By the Beavcon engineering team Updated Reviewed by the Project Engineers Site execution and single-point coordination
- Constraint
- Occupied tower; consultant and authority approvals on the critical path.
- Solution
- Single-point coordination of all trades plus consultant and authority submissions.
- Outcome
- Full floor handed over with close-out documentation.
- Status
- Completed
Full case study
ADNEC Tower: fit-out of three floor plates inside an occupied tower
Three consecutive floors under one coordinated multi-trade programme, with consultant and authority approvals on the critical path.
Facts, the constraint, the sequence used and the records · no project values published
A complete floor fit-out inside the operating ADNEC Tower: demolition, partitions, specialty ceilings, electrical and HVAC, firefighting, automated glass systems, furniture and carpet. Beavcon held the single point of coordination for every trade and managed consultant and authority submissions, closing out with as-builts and handover records.
Services · Commercial Fit-Out · MEP Works · HVAC / AC · Aluminium & Glass · Strip-Out / Demolition
Guides · Documented close-out · Engineering-led project management · Villa renovation, one contract · Single contractor vs trades
-
Specialty ceiling, wood wall and carpet after handover -
Circular column, wood door and glazed partition -
Glazed office with desk after furniture install -
Meeting room looking through a glass partition
Request similar work
Send us your scope.
Upload drawings, BOQ or photos. A reference is issued immediately and an engineer reviews the package before it is priced.
RFQ received · Reference
BC-RFQ-0000-0000
Acknowledgement sent; our estimating team will respond. An engineer reviews your scope and files before anything is priced.
- Reference issued
- Engineer review — next
- Proposal — to follow
Files and details are used only to prepare your quotation and are stored securely.