Skip to content

Service · Glass & Aluminium

Aluminium and Glass Contractor in Dubai

Partitions, doors, automated glass systems and façade glazing packages.

Request similar work WhatsApp us

By Updated Reviewed by the Technical Manager Registered with the Society of Engineers UAE and Abu Dhabi Municipality

Dubai Trade Licence No. 1277078 · ISO 9001 / 14001 / 45001

Glazed office partition and door after a commercial fit-out
Aluminium & GlassDubai · Abu Dhabi · UAE
What is included
  • Frameless and framed glass office partitions and doors
  • Automated sliding and swing glass door systems
  • Aluminium windows, doors and sliding systems for villas
  • Shopfronts and curtain-wall infill panels
  • Glass balustrades, shower screens and mirrors
  • Façade glazing repairs and replacement
  • Survey, shop drawings, fabrication and installation

Measured, drawn, then made

Aluminium and glass packages are unforgiving of guesswork. An opening measured wrongly or a profile that clashes with a ceiling costs weeks in re-fabrication. Beavcon surveys every opening on site, issues shop drawings for approval and only then releases fabrication, so that fabrication follows the approved drawings.

Partitions, doors and automated systems

For offices we deliver frameless and framed glass partitions, doors and automated sliding and swing systems, coordinated with access control and fire alarm interfaces. On the ADNEC Tower floors the automated glass systems were installed as part of the same fit-out contract as partitions, ceilings and MEP, so the interfaces between those trades sit under one contractor.

Windows, doors and façade works

For villas and buildings we replace and install aluminium windows, sliding doors, shopfronts and curtain-wall infill panels, and carry out façade glazing repairs. Landlord and consultant approvals for external changes are handled with the submission.

Installed with protection, closed with documentation

Installation is phased to keep occupied areas working, finished surfaces are protected and each package closes with adjustment, cleaning and warranty documentation.

Target: qualified proposal within 48 hours for standard packages.

How the package runs
  1. 01

    Survey

    Openings measured on site; existing frames and structure checked.

  2. 02

    Shop drawings

    Profiles, glass specification and hardware submitted for approval.

  3. 03

    Priced offer

    Fabrication, installation and programme in one proposal.

  4. 04

    Fabrication and installation

    Delivered to programme with protection of finished areas.

  5. 05

    Handover

    Adjustment, cleaning and warranty documentation.

Typical constraints we handle
  • Site tolerances in existing buildings
  • Landlord and consultant approval of façade changes
  • Lead times on glass processing and hardware
  • Access equipment for façade works
Case studies for this package
Guides for this package
FAQ

Questions on aluminium & glass.

Yes. Automated glass systems were part of the ADNEC Tower floor fit-outs, coordinated with access control and fire alarm interfaces. They were installed within the same contract as partitions, ceilings and MEP, so the interfaces between those trades sit under one contractor. See what a fit-out contractor coordinates.

Yes. Window and sliding door replacement is delivered as a standalone package with reinstatement of internal and external finishes. Each opening is measured on site and shop drawings are approved before fabrication, so the replacement is made to fit the existing structure without a wider renovation scope.

Yes. Shop drawings with profiles, glass specification and hardware schedules are submitted for approval before fabrication. Beavcon surveys every opening on site, issues the drawings and only then releases fabrication, so that fabrication follows the approved drawings.

Yes. Partitions are installed in phases with protection of finished areas and out-of-hours delivery where the building requires it. Phasing helps keep the occupied areas working, delivery is arranged with building management, and each package closes with adjustment, cleaning and warranty documentation.

Frameless and framed glass office partitions and doors; automated sliding and swing doors; aluminium windows, doors and sliding systems for villas; shopfronts and curtain-wall infill panels; glass balustrades, shower screens and mirrors; and façade glazing repairs and replacement, from survey and shop drawings through fabrication and installation.

In five steps: survey, with openings measured on site and existing frames and structure checked; shop drawings of profiles, glass specification and hardware submitted for approval; one priced offer covering fabrication, installation and programme; fabrication and installation with protection of finished areas; then adjustment, cleaning and warranty documentation at handover.

Site tolerances in existing buildings, landlord and consultant approval of façade changes, lead times on glass processing and hardware, and access equipment for façade works. We raise these at the survey and shop-drawing stage, so the lead time can be built into the offer's programme and approvals are less likely to be discovered after fabrication.

A hotel fit-out needs a different aluminium and glass specification from an office. Three questions come first: which partitions must be fire-rated, what acoustic performance the operator requires, and where automated entrances sit on the critical path. Fix them early, not late. See aluminium and glass specification for hospitality in Dubai and Abu Dhabi.

BuildScope by Beavcon

Request similar work

Send us the aluminium & glass scope.

Work type is preselected. Upload drawings, BOQ or photos and an engineer reviews the package before it is priced.

How to use

Five steps. Pick a work type, then Next. Attach drawings if you have them. Submit on the last step.

  1. 01 Work type
  2. 02 Location
  3. 03 Details
  4. 04 Files
  5. 05 Your details
01 / 05 What kind of work is it?

Work type — what kind of package is this? Select one or more so it reaches the right estimator.

02 / 05 Where is the site?

Location — Dubai or Abu Dhabi. We mobilise to the other Emirates project by project.

03 / 05 Project details

Details — area, dates and budget. Approximate figures are fine — we confirm quantities on site.

04 / 05 Upload files

Files — drawings, BOQ or photos, optional.

    Executable files are rejected. Files are used only to prepare your quotation.

    05 / 05 How do we reach you?

    Your details — review and send. A reference is issued immediately; an estimator follows up.

    Preferred contact

    By submitting you agree to our privacy policy. Files and details are used only to prepare your quotation and are stored securely.

    01 / 05 · Work type — what kind of package is this?
    Related projects
    • Abu Dhabi · Commercial / Government · 2026

      ADNEC Tower — 2nd Floor

      Developer client · Full fit-out: demolition, partitions, specialty ceilings, electrical & HVAC, firefighting, automated glass, furniture & carpet

      Constraint
      Occupied tower; consultant and authority approvals on the critical path.
      Solution
      Single-point coordination of all trades plus consultant and authority submissions.
      Outcome
      Full floor handed over with close-out documentation.
    • Abu Dhabi · Commercial · 2025

      ADNEC Tower — 5th Floor

      Developer client · Full fit-out incl. demolition, partitions, specialty ceilings, electrical, HVAC, firefighting, automated glass, wall finishes

      Constraint
      Live tower — demolition and MEP works inside an operating building.
      Solution
      Phased demolition and firefighting tie-ins coordinated with building management.
      Outcome
      Handover complete, including automated glass and wall finishes.
    • Dubai · Residential · 2024

      Jumeirah Villa

      Private client · Full villa renovation for a private owner

      Constraint
      Private villa, full renovation scope.
      Solution
      One contractor for civil, MEP and finishing.
      Outcome
      Completed and handed over.

    Related services · Commercial Fit-Out · Villa Renovation · Building Refurbishment

    Guides · What a fit-out contractor coordinates · Occupied-tower programme

    Request site visit

    Book a site visit

    An engineer visits, records constraints and photos, and a written scope follows. Dubai and Abu Dhabi first; other Emirates by arrangement.

    Reference issued on submit

    Invite Beavcon to tender

    Tender invitation

    Attach the tender documents or BOQ; an engineer confirms receipt and the submission date.

    .pdf .dwg .dxf .xlsx .xls .csv .doc .docx .jpg .png .zip · max 25 MB each · executable files rejected

    Reference issued on submit