Abu Dhabi · Commercial · 2026
ADNEC Tower — 4th Floor
In 2026 at Abu Dhabi, Beavcon delivered complete fit-out package under the same coordinated multi-trade programme as the completed floors for a developer client. Constraint: Third consecutive floor inside an operating tower. Outcome: On site; milestones tracked against programme.
By the Beavcon engineering team Updated Reviewed by the Project Engineers Site execution and single-point coordination
- Constraint
- Third consecutive floor inside an operating tower.
- Solution
- Repeat programme, sequencing and QA/QC from the completed floors.
- Outcome
- On site; milestones tracked against programme.
- Status
- In progress
Full case study
ADNEC Tower: fit-out of three floor plates inside an occupied tower
Three consecutive floors under one coordinated multi-trade programme, with consultant and authority approvals on the critical path.
Facts, the constraint, the sequence used and the records · no project values published
The third consecutive floor Beavcon has fitted out at ADNEC Tower. The programme, trade sequencing and QA/QC formats proven on the 5th and 2nd floors are being repeated, with milestones tracked against the agreed programme.
Services · Commercial Fit-Out · MEP Works · HVAC / AC
Guides · Documented close-out · Engineering-led project management · Villa renovation, one contract · Single contractor vs trades
-
Floor plate after strip-out, before partitions and ceilings -
Linear diffuser being fitted into a finished ceiling
Request similar work
Send us your scope.
Upload drawings, BOQ or photos. A reference is issued immediately and an engineer reviews the package before it is priced.
RFQ received · Reference
BC-RFQ-0000-0000
Acknowledgement sent; our estimating team will respond. An engineer reviews your scope and files before anything is priced.
- Reference issued
- Engineer review — next
- Proposal — to follow
Files and details are used only to prepare your quotation and are stored securely.