Abu Dhabi · Commercial · 2025
ADNEC Tower — 5th Floor
In 2025 at Abu Dhabi, Beavcon delivered full fit-out incl. demolition, partitions, specialty ceilings, electrical, hvac, firefighting, automated glass, wall finishes for a developer client. Constraint: Live tower — demolition and MEP works inside an operating building. Outcome: Handover complete, including automated glass and wall finishes.
By the Beavcon engineering team Updated Reviewed by the Project Engineers Site execution and single-point coordination
- Constraint
- Live tower — demolition and MEP works inside an operating building.
- Solution
- Phased demolition and firefighting tie-ins coordinated with building management.
- Outcome
- Handover complete, including automated glass and wall finishes.
- Status
- Completed
Full case study
ADNEC Tower: fit-out of three floor plates inside an occupied tower
Three consecutive floors under one coordinated multi-trade programme, with consultant and authority approvals on the critical path.
Facts, the constraint, the sequence used and the records · no project values published
Full-floor fit-out delivered inside a live commercial tower. Demolition and firefighting tie-ins were phased with building management so occupied floors stayed operational, and the package was handed over complete with automated glass partitions and wall finishes.
Services · Commercial Fit-Out · MEP Works · HVAC / AC · Aluminium & Glass
Guides · Documented close-out · Engineering-led project management · Villa renovation, one contract · Single contractor vs trades
-
Reception desk and glazed waiting room after handover -
Meeting room with walnut table and glass partition -
Glazed manager office looking onto the floor plate -
Prayer room with carpet, cove lighting and blinds -
Feature column and linear ceiling after finishing
Request similar work
Send us your scope.
Upload drawings, BOQ or photos. A reference is issued immediately and an engineer reviews the package before it is priced.
RFQ received · Reference
BC-RFQ-0000-0000
Acknowledgement sent; our estimating team will respond. An engineer reviews your scope and files before anything is priced.
- Reference issued
- Engineer review — next
- Proposal — to follow
Files and details are used only to prepare your quotation and are stored securely.